Data Centre Configurator

First, let us know who you are…

Where in the UK do you want your data centre to be located?

Select a location or learn more about the options.

Location

Your data centre location is based upon your personal preferences as well as your data needs. All of our sites are leading in the vision of eco-friendly data centres. We aim to accommodate you in the best and most flexible manner available, regardless of your preferred location. Click here for more information on our locations.

CORSHAM

FARNBOROUGH

ENFIELD
(GOING LIVE 2019)

I DON'T MIND

What will be your total IT load?

Select a range or learn more about loads.

IT load

Your IT load specification helps us determine the best solution we can offer you based on your unique data needs. Our data centres are secure, flexible and compatible with your growth needs.

UNDER 10kW

10kW TO 100kW

100kW TO 300kW

300kW TO 500kW

OVER 500kW

I'M NOT SURE

What type of cooling system do you require?

Select an option or learn more about cooling systems.

Cooling system

Your choice of cooling system helps us determine the best solution we can offer you based on your unique data needs. For more information on the options, click here.

DIRECT AIR
COOLING

INDIRECT AIR
COOLING

CHILLED WATER
COOLING

I'M NOT SURE

What's your view on operational costs?

Select an option or learn more about operational costs.

Operational costs

Fixed Operational Costs mean you pay a fixed amount for your power usage each billing period. Variable Costs mean that the payment made by you varies depending on the amount of power used.

I LIKE FIXED OPERATIONAL COSTS

I DON'T MIND VARIABLE COSTS

I'M NOT SURE

What will be your rack density?

Select an option or learn more about rack density.

Rack density

Rack density is a measurement of the amount of data placed within each rack storage unit. Our cooling technology allows for up to 50kw of cooling in a single rack position, and provides the flexibility across your IT white space to mix high and low density racks in any combination, optimising the use of floor space and making layout planning simple.

UNDER 4kW

4kW TO 6kW

6kW TO 10kW

10kW TO 20kW

OVER 20kW

I'M NOT SURE

When do you need it?

NOW OR WITHIN 3 MONTHS

WITHIN 6 MONTHS

WITHIN 12 MONTHS

I'M NOT SURE

Any further requirements?

That's it!

We'll get back to you ASAP.